Solar PV & Battery Offer!
Install a full Solar PV & Battery Storage System from just £6,495.00!
00
Days
00
Hrs
00
Min
00
Sec
Learn More
Close
Call us today Call us today: 01948 820200 24 hour reactive service

Restoration of the historic Jubilee Hall building…

Barlows team of skilled joiners were appointed to carry out sympathetic joinery repairs to the timber beams to the front and side elevations of the histori...

Barlows team of skilled joiners were appointed to carry out sympathetic joinery repairs to the timber beams to the front and side elevations of the historic Jubilee Hall in Malpas.

As the decorators carried out their preparation it soon became apparent that there was a large amount of rot to much of the framing timberwork, finials and windows. The repairs were carried out by cutting out and removing the rot and splicing in new sections of timber using traditional jointing methods where possible. The repaired joints were then filled and rubbed flush prior to priming in preparation for redecoration.

Header   IMG_6670   IMG_6620

Works carried out:-

IMG_0148                      IMG_0169                     IMG_6617

Case Studies

Accreditations
alt="active"
Accreditations
alt="active"